Pebble Creek

McAdams worked with the City of Asheville to protect and stabilize Dingle Creek between two existing townhome units in the Pebble Creek community. The existing stream became impaired as a result of failure of the existing gabion structures and threatened the structural integrity of the adjacent residential structures. McAdams, and our sub-consultants, provided analysis and construction drawings for the remedial action and provided construction administration and observation services throughout implementation of the project. The improvements addressed both the stability of the streambanks, as well as ensured adequate conveyance for the contributing watershed.

Location
  • Asheville, NC