Notre Dame Stadium received a major playing surface upgrade in 2014 with the installation of a new synthetic turf field system. The project included removal of the existing natural grass field, installation of an advanced drainage system and placement of a rubberized E-layer beneath the synthetic turf to enhance field performance and player safety. Innovative porous concrete runways were also incorporated beneath the playing surface behind the team benches, allowing large mobile camera platforms to operate throughout the stadium without impacting the field. The result is a high-performance athletic venue that supports game-day operations while preserving the iconic experience of Notre Dame Stadium.
- Location
-
- South Bend, IN
- Project Owner
-
- The University of Notre Dame
- Project Size
-
- 80,795 seats
- Teaming Partners
-
- DA Hogan and Associates
- Services Leveraged
- Project Types
Balancing Tradition and Performance
The Notre Dame Stadium field replacement required innovative construction solutions to accommodate one of the most recognizable venues in college athletics. Working within the constraints of a historic stadium footprint, the project integrated advanced drainage infrastructure, a rubberized E-layer and concealed porous concrete runways that support game-day media operations without impacting field performance.
Project Features
- Synthetic Turf Field Replacement
- Advanced Field Drainage System
- Rubberized E-Layer Installation
- Porous Concrete Camera Runways
- Enhanced Player Safety + Performance
- Historic Stadium Modernization
- Year-Round Field Durability